From: route@monster.com
Sent: Saturday, April 16, 2016 2:05 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: NSN Construction Manager
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Calvin
C. Nguyen
222 E.
Embercrest Dr.
Arlington, TX 76018
Mobile: (817) 264-3231
E-Mail: calvinnguyen6868@yahoo.com _____________________________________________________________________________________ OBJECTIVE
Seeking in Field Technician Position,
Installation, Integration, Dispatcher/Call Center Rep (OSP), Site Surveys,
Site Audit, Site Preparation, Drive Test/Call Test.
COURSE WORK AND TRAINING
- Ericsson Node B
- TP76300 Certified
- Ericsson RBS series.
- Nokia BTS types.
- Understanding of all components of a GSM network.
IS-95/J-Std008
- Understanding of CDMA2000 network. WORK
BACKGROUND
UMTS integration using Hyper Terminal and EMAS
loading up Basic Package and Upgrade Package, Scrip, Cabinet Configuration,
O&M Access. UMTS Call Testing and Troubleshooting. Installation of Ericsson 3106/3206/3308/3018/3518 RBS
(Radio Base Stations) for cell site commissioning. Install 3106 (upgrade version) for UMTS cell site
integration. Modify floor plans for UMTS requirements. Prevent downtime with implemented failover testing and
other high availability solutions. Create custom inverse multiplexing access scripts for
deployment and implementation. Work in conjunction with RF teams for cell
site antenna sector designation for UMTS. Spectrum analyzer (Anrtisu) and T-Berd (Actrena)
testing for line sweeping and T1 diagnostics. Integrate T1 for newly acquired Node B equipment. Upgrade software for Axxius, Flexmaster (CSU)
equipment to accommodate T1 transmissions for UMTS. Monitor and upgrade DS/0
cross-connections for UMTS configuration. Configure TSR software
upgrade for GPS/Location Module Units (LMU). Testing and troubleshooting of T1 network
upgrades for UMTS consolidated projects
Regroomed the Ericsson RBS 2102, 2106, 2206,
moved the radio from the decommissioned cabinet to retained cabinet to make
room for UMTS NODE B 3018 installation. Include moving NIU, Carrier Access
and LMU (commission when required). Use OMT to change IDB for correct radios
config. Replace micro-cell 2109 with 2308, config the radios per specs.
Installed and Powered Up NODE B 3308 micro-cells, Combos 3018, 3106, 3206
RBS. T1 EXPANSION Adding T1’s from Telco Box (NIU) thru Surge
Arrestor, DSX, CSU to reach Node B Equipment. Test T1 to meet requirements. NOKIA FLEXI TECH LEVELS (URT2) at EXI Parson (Dallas, Texas)
[Oct, 07-Dec, 07] Site Survey Install FCOA cabinet following Engineer Drawing
Design Install Nokia UMTS Flexi BTS followed Engineer
Drawing Design. Stack Mount, Wall Mount, Pole Mount, RRU, and FCOA. Install T1 for UMTS from TELCO to BTS.
Check BTS alarm. Troubleshoot Equipment.
Install RF jumper, Anritsu sweep RF Cables and terminate on BTS RF
point
DC power troubleshoot Call switch to integrate. T-mobile UMTS Closeout Document. Verify Antenna
picture for UMTS swapping, cable sweep data from construction contractor
at 4G COMMUNICATION. (Los Angeles, California
Market) [Sept, 07- Oct,
07]
Collected cell site
coordinates. Use Map Info to find the correct path direction.
Measure the obstacle’s height, to determine whether or not
obstacles are on the path. Then define the path is blocked or not. Complete
Path Survey and daily report.
Swapped and removed TDMA system (Nortel Cabinet)
on each Cingular Cell Sites, Arizona Market.
Performed Site Survey for UMTS on each T-Mobile
Communication Cell Sites, Bay Area, CA. Provide information and
preparation future equipment.
Install LMU, GPS/GSM antennas
and Surge Arrestor. Swept all RF cables using Anritsu. Install RF cables for
850 and 1900 MHz Dual band. Configured and test installed LMU using ProComm
Plus. Troubleshoot LMU and test T1/V.35 with Switch. Complete Site Survey and
daily report. Harvest: Removed WLS and all
cables from WLS. Commission, maintenance and troubleshoot LMU.
Perform Site Audit for E-911 Services on each
Cingular Communication Cell Sites, La-1 California Market. Perform E-911 Site Preparation, including
installation, programming and commissioning the FLEXmaster on line to
communicate with True Position Switch. Install KDI Port Expander and Ericsson ASU
(Antenna Share Unit), Performed T1 Loop-back Test from BTS to RNOC. Perform Call Test on each PCS, GSM, and TDMA
communication cell site. Assistant Project Coordinator: Collect and
analyze Site Data, schedule and assist filed Techs. Member of Rapid Response Team: Provide support
to True Position crews in completing installation of True Position Wireless
Location System - LMU.
(Fort Lauderdale,
FL)
[Apr, 05 – Jan, 06] Program and commission True Position Wireless
Location System, LMU. Install True Position LMU radio into GSM
Ericsson (RBS2106/RBS2206/RBS2250) cabinet. Installation, Testing and Commissioning the
GPS/GSM downlink antenna, use Garmin 76-S to collect GPS latitude and
longitude and site survey items for above ground level determination.
Perform T1 Loop-back test from BTS to RNOC. Integrated and Commissioned True Position LMU
radio on line to communicate with True Position Switch. Performed extensive troubleshooting and perform
site surveys on each PCS Analyze test and feedback result to Field Manager
Programming and commissioning True Position
(E-911 LMU) Wireless Location System deployed at VA Market. Install LMU radio into GSM Ericsson
(RBS2106/RBS2206/RBS2250) cabinet in the NY Market. Installation, Testing and Commissioning the
GPS/GSM downlink antenna, use Garmen 76-S to collect GPS latitude and
longitude and site survey items for above ground level determination.
Perform T1 Loop-back test from BTS to RNOC. Integrate and Commissioned LMU radio on line to
communicate with True Position Switch. Performed extensive troubleshooting and perform
site surveys on each PCS communication cell site. SKILLS Wireless Technologies:
Databases:
|
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|